Outpatient and emergency building, new inpatient building put into use
In the 1980s and 1990s, while focusing on the development of medical services, the hospital also attached great importance to infrastructure construction.
In the late 1980s, the preparatory work for the reconstruction and expansion project began. In 1990, land acquisition and demolition began. Outpatient and inpatient buildings were built. The number of hospital beds was planned to be expanded from 530 to 800.
In 1992, the interior of the hospital before the reconstruction and expansion was photographed
The entrance to the old clinic, demolished in 1993
The north side of the surgical building and the sewing room, carpentry room, laundry room, carpentry room, etc. were demolished in 1993
Old pediatric building built in 1929, demolished in 1992
The old surgical building was converted into a medical technology building and demolished in 1993
Entrance to the old inpatient department
Old office building at the current sewage treatment station. Demolition in 1993
The back door of the hospital before the reconstruction and expansion project – the alley leading to Jiefang Road from Jiqing Street, demolished in 1993
The back of the old internal medicine building is the old outpatient building, and the bungalow is the inpatient department charging office
On March 9, 1993, the groundbreaking ceremony for the new outpatient ward building was held, and construction officially started on May 8.
Foundation Ceremony of Hospital Reconstruction and Expansion
The reconstruction and expansion project of the outpatient ward building is listed as a key project in the “Eighth Five-Year Plan” and “Ninth Five-Year Plan” of Hunan Province. Teng Wensheng, the leader of the general office, Lin Jiamei, an old leader of the Department of Medical Affairs of the Ministry of Health, and leaders of the provincial party committee and government, including Liu Fusheng, Dong Zhiwen, Shen Ruiting, Wang Keying, Pan Guiyu, and Luo Guiqiu, have worked at the reconstruction and expansion site of the hospital.
Wang Keying on-site office
Pan Guiyu inspects the reconstruction and expansion project of the hospital
In order to solve the problem of the funding gap for the reconstruction and expansion of the hospital, Zeng Fanyou, the then director of the Provincial Health Department, and the main leaders of the hospital went to Beijing to raise funds many times. Thanks to the efforts of many parties, the reconstruction and expansion project of the hospital was successfully completed.
In December 1998, the new inpatient building of the hospital was officially put into use. Leaders of the provincial party committee and government and people from all walks of life came to congratulate, and President Liu Jiafu presided over the opening ceremony
June 28, 1997, outpatient building opened
The total construction area of the outpatient building is 11,600 square meters, and the total construction area of the inpatient building is 30,000 square meters, with a total of 832 beds. improve the medical environment of the people.