Recently, several road sections in Liaocheng City have been closed for construction, including Liuyuan Road (Hunan Road-Dongchang Road), Liaoshi Nangou (Liuyuan Road-Liaodaxi) Road), Liaotang Road (South-to-North Water Diversion River – Dongchang Lake), as well as the previously closed sections of Dongguan Street (to Mishijiekou in the west and Liuyuan Road in the east), south of Xinguang Street, and Guanyikou Street. , please avoid the morning and evening rush hours and pay attention to detours.
On the morning of April 13th, the reporter visited the gate near the gate in Liaocheng City. Since this section is the intersection of Dongguan Street and Liuyuan Road, the two roads were closed for construction at the same time. , the traffic pressure has increased significantly. It is understood that Liuyuan Road (Hunan Road-Dongchang Road) drainage and road restoration works will be under construction from 22:00 on April 10, 2022 to 22:00 on May 31, 2022, span>In order to ensure the traffic safety and the smooth progress of the construction during the construction period, the middle four-lane section of Liuyuan Road (Hunan Road-Dongchang Road) has been closed, and all the intersections will be passable during the construction period and will not be closed. During the period, the roads on both sides will be temporarily closed for construction from 22:00 at night to 5:00 the next day, and covered with steel plates during the day to ensure normal traffic. During the construction period, all vehicles are prohibited from parking in the motorway of Liuyuan Road (Hunan Road-Dongchang Road). When social vehicles pass through the above-mentioned road sections, please strictly abide by the “Road Traffic Safety Law of the People’s Republic of China” and other relevant laws and regulations, and pass according to the instructions of the traffic police and on-site staff.
At the same time, due to the construction needs of the Dongguan Street infrastructure renovation and upgrading project in the Canal Area of Liaocheng City, from March 15, 2022 to June 1, 2022, Dongguan Street infrastructure During the construction of the renovation and upgrading project, the infrastructure of Dongguan Street (rainwater and sewage diversion, road improvement, optimization of parking space, etc.) needs to be reconstructed. During the construction, the roads will be closed in stages according to the gate-new highway, new highway-Dongguan dental clinic, Dongguan dental clinic-Xiaobaisi Street, Xiaobaisi Street-Dabaisi Street. To this end, relevant departments have also set up signs with warm reminders at prominent locations, reminding everyone that Dongguan Street (West of the Ancient Canal – Mishi Street) is closed for construction, and vehicles and pedestrians passing Dongguan Street can go south. Bypass the West Canal Road-New Highway, and go north to the East Canal Road-Limin Road-West Canal Road, a small worship temple street.
Liaoshi Nangou (Liuyuan Road-Liaoda West Road) and Liaotang Road (South-to-North Water Diversion Project) have been closed for construction recently. River-Dongchang Lake) section, Liaotang Road (South-to-North Water Diversion River-Dongchang Lake) traffic control hours are from 22:00 on April 10, 2022 to 22:00 on May 31, 2022 span>, Liaotang Road rain and sewage diversion, road engineering South-to-North Water Diversion River-Beijing-Kowloon Railway section on the south side of the green belt and non-motor vehicle lanes are closed for construction all day, and the north half of the rightmost motor vehicle lane and non-motor vehicle lane are all day Closed construction. Beijing-Kowloon Railway – Zhanqian South section of the northern half of the rightmost motor vehicle lane and non-motor vehicle lane will be closed for construction throughout the day. Zhanqian South Road-Changrun Road section on the far right side of the north side of the motor vehicle lane and non-motor vehicle lane will be closed for construction all day, and the green belt and non-motor vehicle lane on the south side will be closed for construction throughout the day.
Liaoshi Nangou (Liuyuan Road-Liaoda West Road)Drainage and The closed construction time of the road restoration project is divided into two sections. From 22:00 on April 10, 2022 to 22:00 on May 10, 2022, the motorway of this road section will be closed for construction, and from 22:00 on May 10, 2022 to 2022 At 22:00 on May 31, 2019, the non-motorized vehicle lanes and sidewalks on both sides will be closed for construction.
Qilu Evening News·Qilu One Point Reporter Guo Qingwen